City School
Delivered in two phases for R Education and Academic Development (READ) — the first phase completed in 2017, the second phase in 2019 — City School in Al Tallah grew into a 244-classroom campus with an unapologetically saturated color palette. Panels in orange, violet, blue, and grey break the façade into distinct blocks rather than one continuous elevation, while a dramatic tensile shade structure sails over the central turf area, its sculpted canopy framing the entrance walkway below. Proarc managed both phases in full, from concept through to site completion.
| Client | READ (R Education and Academic Development) |
|---|---|
| Location | Al Tallah, AjmanDirections |

Planning something similar? Talk to the team that delivered City School.
Contact